berth scheduling
基本解释
- [交通运输工程]泊位调度
- [计算机科学技术]泊位调度
英汉例句
- This paper builds a simulation and optimization model for minimizing the total stay time of ships, which aims at the problem of berth and quay crane (QC) scheduling.
针对集装箱码头的泊位分配及岸边集装箱起重机(岸桥)调度问题,本文建立了最小化总体船舶在港时间的仿真优化模型。 - Two other issues arise with independence: scheduling and no automatic BCS berth.
FORBES: Longhorn Network Isn't A Roadblock For Texas To Join Pac-12
双语例句
权威例句
专业释义
- 泊位调度
The coordinated optimization of continuous berth scheduling and quay crane dynamic allocation is a key factor for a seaport container terminal to improve its competitiveness. A mixed integer programming model on the problem is formulated.
连续泊位调度与岸桥配置协同优化是集装箱码头提升竞争力的关键因素。计算机科学技术
- 泊位调度