caving zone
基本解释
- [能源科学技术]冒落带垮落带
- [地球科学]坍塌区
英汉例句
- Finally, the distribution law of stress filed and the causes of goaf caving zone were analyzed according to the primary stress nephogram.
最后从主应力云图来分析了采空区内部的应力场分布规律及空区垮落带形成的原因。 - Describes the methods of reinforcing roof of the plank and surrounding rock by using pipe-burying filling, to mak them as a whole, so as to go-through the caving zone safely and smoothly.
详细介绍了采用埋管注浆方法充填加固冒落段巷道顶板及围岩,使之胶结成为整体,从而安全顺利地通过该冒落带的施工技术。 - This paper brings up the following new opinions that coal layer extraction hasnt caving zone in efflorescent oxygenized belts which have two effects of blocking wate…
受采动影响后,具阻水和抑制导水断裂带继续发展的双重作用以及移动快、变形大、回宿快、下沉大和适当加大开采厚度等新观点。
双语例句
词组短语
- caving process zone 崩落过程区
- height of caving zone 垮落带高度
- regularly caving zone 规则垮落带
- irregularly caving zone 不规则垮落带
- caving and rock fracture zone 冒裂带
短语
专业释义
- 冒落带
The range of the tensile stress zone increases with the increase of the ratio between the height of the caving zone and periodic weighting step, with the increase of the ratio between the horizontal tectonic stress and vertical stress.
拉应力范围随冒落带高度与周期来压步距的比值的增大而增大,随水平构造应力与垂直应力的比值的增大而增大。 - 垮落带
Based on the field test, the caving zone's maximum height is obtained, it is 11.34~15.74m, the caving zone height and coal thickness ratio is 1.44~1.69.
3.通过两带移动规律现场实测研究,得出了试验综放工作面的实测垮落带发育高度为11.34~15.74m,垮采比为1.44~1.69。地球科学
- 坍塌区