construction period
基本解释
- [建] 施工期
英汉例句
- There exist some misunderstandings in dealing with these suspended components during the construction period.
施工人员在施工期间如何处理这些构件的问题上常存在着一些误解。 - Thus, stable hole, smooth drilling and tripping operations and zero outage time have been obtained in the construction period.
使该井在施工期间,井壁稳定、起下钻井眼畅通,全井事故、复杂时效均为零。 - This month Suez Canal managers will announce that they plan to offer discounts during the construction period of the enlarged Panama Canal.
本月,苏伊士运河管理人员将宣布,他们计划在巴拿马运河扩建期间提供折扣(不太清晰,能不能说提供优惠服务)。 - "In the moratorium just announced by the government of Israel, there will be no new housing construction starts during the 10-month period.,"
- Meanwhile, during the same period, construction jobs rose from 7.2% to 7.5% and the sum of service sector and government employment rose from 40.8% to 41.1%.
FORBES: Brazil: A Bubble In Labor Markets - They insist that there were only 4 "incidents" in that period and only 22 since construction began.
FORBES: Magazine Article
双语例句
原声例句
权威例句
词组短语
- construction preparation period 施工准备阶段
- Construction prepare period 施工准备期
- Construction Target Period 施工目标期
- project construction preparing period 项目实施准备阶段
- construction work period 建设工期
短语
专业释义
- 建设期
- 建设工期
- 施工工期
- 施工期
The life cycle of concrete bridges consists of three periods, i. e. , construction period, service life and degradation process. The failure probability of cable-stayed bridges during construction is higher than that during service life.
混凝土桥梁结构的生命全过程可分为施工期、使用期、老化期三个阶段,现行规范主要针对正常使用阶段,对施工期的可靠性研究还很少。 - 施工工期
The construction period risk is one of the important reason of leading to project delays’resulting in the project progress’ the quality and the investment object out of control.
施工工期的风险是导致工程延误,造成项目进度、质量和投资目标失控的重要因素之一。 - 建设期
- 施工阶段
Design and analysis of the survey methods in the construction period of Yangzi River channel of Nanjing.
4.对南京长江过江通道工程施工阶段的测量方法进行了设计和分析。土木建筑工程
- 施工期
- 施工工期
- 施工工期
We make comparison based on investment,construction techniques,construction period and impact on environment by the Shield-driven Tunnel and Mined Tunnel schemes after analyzing geological condition in the region.
在历次线路规划、方案比选工作中有切岗线方案、绕岗线方案、隧洞线方案等。 对隧洞线,在已有地质资料基础上又进行了补充地质勘察工作,并分别对盾构法、矿山法隧洞设计方案从施工技术难易程度、施工工期、对环境的影响及投资等方面进行了比较、分析、研究,结果选定盾构法圆型无压隧洞2条隧洞方案。能源科学技术
- 工期