excavation method
基本解释
- [交通运输工程]开挖方法
- [土木建筑工程]挖法开挖法
- [地球科学]开挖方法
英汉例句
- In underground structure, excavation method has a great impact on land subsidence and structure stability.
在地下结构中,开挖方式对地表沉降和结构稳定影响很大。 - In the project discussed in this paper, the blasting site of drill-blast tunnel excavation method was close to the newly finished structure.
钻爆开挖法洞室的施工点临近新完成结构体,爆破地震波必须严格控制在安全范围之内。 - The regularity of stress and strain of surrounding rock and support structure when using(3-heading) excavation method to construct double-arc tunnel is carried out by FEM numerical method.
应用有限元数值方法,对连拱隧道“三导洞法”施工时围岩和结构的受力、变形规律进行了分析。在两正洞拱部施工的时候,左右洞拱顶沉降约占最终沉降的70%。
双语例句
词组短语
- open excavation order method 明挖顺作法
- shallow excavation CRD method 浅埋暗挖CRD法
- no -excavation construction method 非开挖施工技术
- cover -excavation reverse method 盖挖逆作法
- crd excavation method crd 工法
短语
专业释义
- 开挖方法
Thus, unilateral pilot tunnel excavation method should be the reasonable approach for Chao Tianmen interchange underground interchange.
因此,单侧壁导坑法应为朝天门地下立交工程较合理的开挖方法。土木建筑工程
- 挖法
- 开挖法
- 开挖方法