rock high slope
基本解释
- [水利工程]岩石边坡
- [能源科学技术]岩石高边坡
英汉例句
- Most of high rock slope are excavated by blasting.
爆破是目前岩石边坡开挖的主要方法。 - In this paper, by using the finite element method and the geomechanics model tests, the writer has studied the mechanism of failure of stratified rock of high slope excavated at the root.
本文采用有限元法和地质力学模型试验相结合的方法,研究了层状岩体高边坡坡脚基坑开挖时的破坏机理、整体抗滑稳定性和预应力锚固方式。 - Some stabilizing structures must be set before cutting a bedding high rock slope, and how to determinate the range of disturbed zone becomes the key problem.
开挖顺层岩石高边坡,往往需要进行预加固,因而合理确定坡体开挖松动区范围就便成为核心问题。
双语例句
词组短语
- soil -rock composite high slope 土
- rock high -slope 岩石高边坡
- Rock high side slope 岩质高边坡
- stratified rock high slope 层状岩质高边坡
- consequent layer rock high -slope 顺层岩石高边坡
短语
专业释义
- 岩石边坡
- 岩石高边坡
Reinforcement slope stability evaluation combine with monitoring results of slope displacement. It that is an advanced technology, safe reliable, economy and proper support formation is supplied to the mine rock high slope reinforcement by research finding in this paper.
论文研究成果为矿山岩石高边坡加固提供了技术先进、安全可靠、经济合理的支护形式。