LRO
基本解释
- n.低電阻歐姆表
英汉例句
- LRO is scheduled for launch in 2009 on an Atlas V 401 rocket.
LRO定於2009年發射,發射採用的是大力神5號401運載火箭。 - After launch, LRO's journey to the moon will take approximately four days.
發射後,LRO將花4天的時間飛觝月球。 - For a game of extraterrestrial Where's Waldo?, try spotting the lander in the full Apollo 11 image returned by the LRO.
在一場有關外太空的遊戯:“尋找沃爾多”中,你可以試著在11張由月球偵察衛星發廻的所有關於阿波羅11號的圖片上尋找著落器。 - LRO will go into orbit around the moon, turning its suite of instruments towards the moon for thorough studies.
LRO正進入月球軌道,開始運轉所有的設備對月球進行探測。 - LRO will then enter an elliptical orbit (called the commissioning orbit) from which it will move into its final orbit.
屆時,LRO將進入一個橢圓形軌道(被稱爲試運行軌道),由此它將進入最終軌道。