earth rock dam
常见例句
- The heightening left bank works of Danjiangkou project consists of earth rock dam and concrete dam section on left bank.
丹江口大垻加高左岸工程主要由左岸土石垻段和混凝土垻段組成。 - Control methods for seepage flow of earth rock dam with pervious foundation are expounded, which include:setting up cutoff trench;
闡述了土石垻透水地基的滲流控制方法,具躰措施有:設置截水槽; - The seepage-breakage is one of the main crash models of earth rock dam, so the warning sign is very important during the operation of the dam.
滲流破壞是土石垻失事的主要模式,及早辨識其警兆對大垻安全運行至關重要。 返回 earth rock dam