pile after driving
常见例句
- The problem of the soil consolidation after tube-pile driving was studied.
研究了黏彈性土中琯樁沉樁後的固結問題。 - After the interval stop the driving continues and that is called pile restart.
將停鎚後繼續進行打樁施工稱爲後繼打樁。 - Here the function mechanism and the technology process of grouting after pile driving technology are explained by engineering examples and the development prospect is pointed out.
本文通過工程實例闡述了樁底注漿的工作原理和工藝流程,指出了樁底注漿技術的發展前景。 返回 pile after driving